Before it started raining today we managed to get the wiring loom into place on the shell. This is quite comforting really because it means we’re pretty much back where we started. When we picked it up it was in about the state we’re at now, which means the repair stage is hopefully over (we still need to get the engine looked at).
We’ve pinned the loom in place by drilling holes and looping heavy duty cable ties through the shell.
I’ve also put a hole in each floor side for drainage as it’s going to be permanatly open topped.


